Parapet Down

A18W0641

In preparation to raze the burned out flamenco building, workers tore out the parapet wall from Patrician Design’s building in order to detach the flamenco building’s roof from the two buildings firewalls. The workmen also sawed out portions of the front and back of the flamenco building to detach the structures’ vertical attachments. The workers labored under a sunny sky throughout the day, but then the sky became overcast with ominous inklings of rain after the workmen had retired for the day.

A18W0646

 

A18W0655

 

A18W0656

 

A18W0652

 

A18W0653

 

A18W0658

 

A18W0661

 

A18W0664