Old toilet that served us well for the past 30 years — RIP. After having to make more modifications to the plumbing and running into more issues with the floor, I finally managed to get the floor covering down and the new toilet installed, but I didn’t get the new bathtub installed. After three days of prep-work, it only took me 30 minutes to replace the backboard behind the toilet and get the new toilet installed. The tub and surround should go in quickly once I have all the prep done. The last photo is Puck in a standoff with Osric.


